Streetscaping & Infrastructure

Paving the way to extraordinary returns on investment

Infrastructure upgrades attract investment from local and national developers.

Overview

A ground-up (and forward-thinking) approach to urban redevelopment

When we embarked on our mission to redevelop East Village, we knew that infrastructure improvements would be crucial catalysts for public and private sector investment and development. Our investment of $396 million into East Village infrastructure—beginning with the basics like flood mitigation and pedestrian oriented sidewalks—has attracted $3 billion of planned development…with more to come.

Key Takeaways

  • 1

    Improving flood resiliency

    Our infrastructure improvements included significant flood control measures that proved their worth during Calgary’s 2013 floods.

  • 2

    Pedestrian-first design

    With close attention to sidewalks, traffic-calming, lighting and other streetscaping enhancements, we ensure the pedestrian takes precedence.

  • 3

    Enhancing connectivity and flow

    The 4th Street SE underpass, new roads like Riverfront Avenue, and 9th Ave SE’s conversion to two-way traffic improve the commuter experience.

  • 4

    The only stormwater wetland in our inner city

    Our innovative stormwater wetland on Fort Calgary’s northwest corner filters stormwater, enhances flood control and provides wildlife habitat.

Media & Recognition

Brownie Award
Brownie Award

Best Small Project, 2018 Read More

Calgary Herald
Calgary Herald

Underpass to link East Village with Calgary Stampede Read More

Global News
Global News

4th Street underpass opens in downtown Calgary Read More

District

Dates

Completed January 2009

Project Team5

  • EXP Services
    EXP Services
    Civil Engineer and Project Lead
  • The Marc Boutin Architectural Collaborative Inc.
    The Marc Boutin Architectural Collaborative Inc.
    Landscape Architect (Phase 11 & 12)
  • PFS Studio
    PFS Studio
    Landscape Architect (Phase 11 & 12)
  • Volker Stevin
    Volker Stevin
    General Contractor (Phase 1-10 & 12)
  • Wilco
    Wilco
    General Contractor (Phase 11)